This project consisted of a six storey student
accommodation building housing in excess of 400 student flats.
|
 |
Construction generally comprises
braced steel frame up to podium level
supported off reinforced concrete pilecaps/ground beams supported
by
precast concrete driven piles.
Superstructure consists of proprietary steel frames site assembled
and built
off holorib concrete decking at all levels.
TMP Provided:
Structural and Civil Design, Project Supervision and Planning